Feasibility Study for Tripoli Sewerage
System
and Wastewater Treatment Plant
| Location |
Tripoli
- Lebanon |
| Client |
Ministry of Hydraulic
and Electric Resources and Council for Development and Reconstruction |
| Duration of Services |
1995 - 1997 (15 months) |
| Cost of Implementation |
USD 100 Million
Phase 1 |
| Financing of Works |
European Bank for
Investment (EIB) |
|
| |
|
|
|
| |
The main units of the wastewater treatment plant including
sludge treatment facilities are as follows:
• Screens
• Aerated grit/grease chambers
• Primary sedimentation tanks
• Aeration tanks
• Secondary (or final) sedimentation tanks
• Return activated sludge pumping station
• Raw sludge thickeners
• Digestion tanks
• Gas storage tank
• Digested sludge thickeners / holding tanks
• Sludge conditioning
• Sludge dewatering unit
• Odour control system
• Disinfection unit (only in case the final effluent is to be used for irrigation)
• Final effluent pumping station |
Scope of Services |
 |
Feasibility Study for sewage networks
and drainage systems |
 |
Preparation of a Master Plan for wastewater
and storm water collection systems |
 |
Preaparation of Tender Documents for sewage treatment plant
and sea outfall |
|
|