Kesrouane Coastal Area Water Supply Project
Location Kesrouane - Lebanon
Client Ministry of Hydraulic and Electric Resources, Council for development and Reconstruction and Kesrouane water Authority
Duration of Services 1995 - 1997 (24 months)
Cost of Implementation USD 88 Million
Cost of Studies USD 2.2 Million
Financing of Works Japanese Fund
 
Project Main Components and Features
El Madiq catchment structures and sand removal basin
El Madiq conveying Tunnel
(Length : 4030 m, Excavated Diameter : 3.8 m)
Pumping stations (19)
Wells (5)
Transmission pipelines (51 km)
Reservoirs (29)
Distribution networks for 28 villages (325 km)
Served population: 252,000 inhabitants in 2020
Water needs: 89000m³/d in 2020
Scope of Services
Houses, institutions and establishments survey
Demographic survey
Water resources development
Feasibility Study
Geological, Hydrogeological and Geotechnical studies
Detailed Design of hydraulic system
• Detailed design of catchment works, 19 pumping stations, 29 reservoirs, 51 km of transmission pipelines, 325 km of distribution lines and installation of a SCADA system.
Detailed Design of El Madiq tunnel
Tender Documents and bills of quantities