West Beqaa Sewerage System
| Location |
West
Beqaa- Lebanon |
| Client |
Ministry of Hydraulic
and Electric Resources |
| Duration of Services |
1995 - 1997 (18 months) |
| Cost of Implementation |
USD 85 Million
|
|
| |
| Project Main Components
and Features |
 |
Sewerage networks - 530km
• Joub Jannine system: serves the towns of Ghazze, Joub Jannine, Kamed el
Laoz, Haouch el Harime and other villages, with a main wastewater treatment plant
located in Joub Jannine for 71,600 persons (year 2020).
• Machghara system: serves Qaraaoun, Baaloul, Machghara and Aitanit with
a treatment plant for 24,000 persons (year 2020).
• Yohmour system: serves Yohmor and Libbaya with a treatment plant for 7,800
persons (year 2020).
• Deir Tahnich, Sohmor, Saghbine, and Qelia systems: serve four, one, two
and one village with treatment plants for 5,000, 5,300, 3,200 and 2,000 persons
respectively (year 2020).
• Zellaya system: serves Zellaya village with a septic tank for 500 persons
(year 2020).
• El Marj and Dahr El Ahmar systems: serve six and eight towns respectively
and their treatment plants are not covered in this project. |
|
|
 |
Treatment Plants: 7 • Joub Jannine treatment
plant with an average capacity of 9,000 m3/day. This treatment will use the extended
aeration method with secondary level of treatment. The effluent will be discharged
in Litani river or used for irrigation. • Machghara treatment plant
with an average capacity of 2,900 m3/day with extended aeration method and the
effluent will be discharged in Litani river or used for irrigation. •
Yohmor treatment plant with an average capacity of 900 m3/day, it will use the
extended aeration method of treatment and the effluent will be discharged in Litani
river or used for irrigation.
• Deir tahnich, Sohmor, Saghbine and Qelia treatement plants with an average
capacity of 720, 720,560 and 290 m3/day respectively.
|
 |
Served population: 180 000 inhabitants (year 2020) |
Scope of Services |
 |
Feasibility study |
 |
Detailed Design for sewer networks and treatment plants |
 |
Tender Documents for construction contracts |
 |
Outline design of the selected alternative |
 |
Detailed cost estimate for capital works |
 |
Investment program |
 |
Financial analysis and tariff proposals |
 |
Environmental impact assessment |
|
|