Tripoli Sewerage System West Beqaa Sewerage System
Akkar Sewerage System    

Akkar Sewerage System
Location Akkar - Lebanon
Client Ministry of Hydraulic and Electric Resources
Duration of Services 1995 - 1997 (18 months)
Cost of Implementation

USD 100 Million

 
Project Main Components and Features

Sewerage networks - 500km and Pumping stations: 13:

• Region of Bebine: 106 km of sewers with 4 pumping stations

•Region of Halba: 108 km of sewers with 4 pumping stations

•Region of Kouaikhat: 70 km of sewers with 4 pumping stations

• Region of el Joume: 103 km of sewers with 1 pumping station

• Region of Qoubaiyat and Chadra: 60 km of sewers

• Region of Michmich: 50 km of sewers

 
Served population: 220 000 inhabitants
Wastewater flow per capita: 120 L/day

Design year: 2019

Treatment plants: 6:

• El Abde wastewater treatment plant will receive discharges from 3 sewer systems of Bebnine, Halba and Kouaikhat and has an average capacity of 26 100 m3/day. This treatment plant will use the activate sludge method and the effluent will be treated to a secondary standard s or level of treatment and then be discharged to the Mediterrantean sea through a sea outfall.

• Gebrayel wastewater treatment plant will receive discharges of El Joume area and has an average capacity of 92 000 m3/day. This treatment plant will be of the biological activated sludge type and the raw sewerage will receive a secondary treatment before discharging the effluent in the river with a possible reuse of the disinfected effluent for irrigation.

• Qoubaiyat watewater treatment plant. This treatment plant will receive sewerage discharges of Qoubaiyat and Andqet. Its average capacity is 8000 m3/day and is of activated sludge type to secondary level of treatment with disinfection of effluent for reuse in irrigation.

• Chadra wastewater treatment plant will receive discharges from Chadrea sewer system and has an average capacity of 2800 m3/day. This plant uses the activated sludge techniques for treatment and the effluent will be discharged in the river.

• Michmich wastewater treatment plant with an average capacity of 7400 m3/day and activated sludge and secondary treatment process.

• Akkar el Atiqa wastewater treatment plant serves Akkar el Atiqa town with an average capacity of 1900 m3/day. This treatment plant uses the same treatment process as the other plants and discharges the effluent in the river.


Scope of Services
Feasibility Study for sewage networks
and drainage systems
Preparation of a Master Plan for wastewater
and storm water collection systems
Preaparation of Tender Documents for sewage treatment plant and sea outfall