Sewerage networks - 500km and Pumping stations: 13:
• Region of Bebine: 106 km of sewers with 4 pumping stations
•Region of Halba: 108 km of sewers with 4 pumping stations
•Region of Kouaikhat: 70 km of sewers with 4 pumping stations
• Region of el Joume: 103 km of sewers with 1 pumping station
• Region of Qoubaiyat and Chadra: 60 km of sewers
• Region of Michmich: 50 km of sewers
Served population: 220 000 inhabitants
Wastewater flow per capita: 120 L/day
Design year: 2019
Treatment plants: 6:
• El Abde wastewater treatment plant will receive discharges from 3 sewer
systems of Bebnine, Halba and Kouaikhat and has an average capacity of 26 100
m3/day. This treatment plant will use the activate sludge method and the effluent
will be treated to a secondary standard s or level of treatment and then be discharged
to the Mediterrantean sea through a sea outfall.
• Gebrayel wastewater treatment plant will receive discharges of El Joume
area and has an average capacity of 92 000 m3/day. This treatment plant will be
of the biological activated sludge type and the raw sewerage will receive a secondary
treatment before discharging the effluent in the river with a possible reuse of
the disinfected effluent for irrigation.
• Qoubaiyat watewater treatment plant. This treatment plant will receive
sewerage discharges of Qoubaiyat and Andqet. Its average capacity is 8000 m3/day
and is of activated sludge type to secondary level of treatment with disinfection
of effluent for reuse in irrigation.
• Chadra wastewater treatment plant will receive discharges from Chadrea
sewer system and has an average capacity of 2800 m3/day. This plant uses the activated
sludge techniques for treatment and the effluent will be discharged in the river.
• Michmich wastewater treatment plant with an average capacity of 7400 m3/day
and activated sludge and secondary treatment process.
• Akkar el Atiqa wastewater treatment plant serves Akkar el Atiqa town with
an average capacity of 1900 m3/day. This treatment plant uses the same treatment
process as the other plants and discharges the effluent in the river.
Scope of Services
Feasibility Study for sewage networks
and drainage systems
Preparation of a Master Plan for wastewater
and storm water collection systems
Preaparation of Tender Documents for sewage treatment plant
and sea outfall