Tripoli Sewerage System West Beqaa Sewerage System
Akkar Sewerage System    

Tripoli Sewerage System
Location Tripoli - Lebanon
Client Council for Development and Reconstruction (CDR)
Duration of Services 1999 - 2000
Cost of Implementation USD 129 Million
Financing of Works Council for Development and Reconstruction (CDR)
 
Project Main Components and Features
Wastewater Network - 200 km
Stormwater Network 80 km

The future wastewater collection system for Tripoli city has been designed on a gravity basis and will comprise two major sewer lines. The larger sewer H (microtunnel) will lead from el Bahsass in the south of the city to the location of the new wastewater treatment plant at Abou Ali river and will collect all flows from the western parts of the city including those from Koura. The second major sewer (N) will run along the coast from el Beddawi to the new treatment plant and will collect all flows from the eastern part of the city including those from Zgharta. It shall also include several other smaller sewers.

Scope of Services
Updating of Feasibility Study
Detailed Design Drawings
Tender Documents.
Definition of cost estimates and planning schedules
Preparation of document for prequalification of contractors and review submissions
Assist in review of tenders for construction works
Reporting
| Bureau Technique pour le Développement | contact@btd-me.com | First Lebanon Member | ebizproduction 2003 |