Boqaata Dam Pre-feasibility Study
| Location |
Boqaata
- Lebanon |
| Client |
Ministry of Hydraulic
and Electric Resources |
| Duration of Services |
1983 (12 months) |
| Cost of Implementation |
USD 65 Million |
|
| |
| Project Main Components
and Features |
 |
Volume of reservoir: 5 Mm3. |
 |
Height of dam: 63 m. |
 |
Type of dam: rockfill dam with impervious cover. |
|
|
| Scope of Services |
 |
Hydrological Studies:
Data collection.
Data analysis.
Analysis of rainfall and river flow time series.
Stream flow routing.
Flood analysis.
Reservoir inventory.
|
 |
Topographic Survey
Detailed topographic survey at 1:5000 and 1:2000 scale.
Establishment of water height-water volume curves and water height - water surface
curves.
|
 |
Geological surveys
Detailed geological surveys at 1:2000 and 1:5000 scales.
Detailed stratigraphic and structural map.
Investigation for construction materials.
Selection of dam type.
|
 |
Preliminary design |
|
|